fbpx

RRC Notre Dame Campus Connections Backgrounder

The current cycling connections to Red River College’s Notre Dame Campus are via the Sherwin Road Pathway on the south side of the campus and the Alexander-Pacific-Elgin Neighbourhood Greenway to the east. Both bikeways were developed prior to adoption of the Pedestrian and Cycling Strategies in 2015 as part of the 2009-2010 Federal Stimulus package.

A new connection along Keewatin Street is currently being developed. In 2018, the pathway along Keewatin Street/Dr. Jose Rizal Way was extended south to Burrows Avenue. Plans for extension of the Keewatin Pathway south through the Keewatin Underpass to Gallagher Ave. will be developed in a functional design study scheduled for 2019. Construction is currently scheduled for 2021 at the same time as a planned road renewal project on Keewatin Street between Selkirk Avenue and Logan Avenue. A neighbourhood greenway along Gallagher Ave, Dee St, Pacific Ave., and Oddy St. would provide connections from the southern end of the pathway at Gallagher Ave. to Red River College’s Notre Dame Campus. The Gallagher-Dee-Pacific-Oddy Neighbourhood Greenway is identified in the Pedestrian and Cycling Strategies.

Completing the Alexander-Pacific-Elgin Neighbourhood Greenway

Alexander-Pacific-Elgin Bikeway

Many of the planned improvements for the Alexander-Pacific-Elgin Neighbourhood Greenway connecting to Red River College have never been completed.

Although plans for the Alexander-Pacific-Elgin Neighbourhood Greenway show several improvements to provide a connection to Red River College via Oddy St., Lismore Ave., and Skinner Rd, other than occasional signage none of the planned improvements along this part of the route were ever built. As the planned Keewatin Street Pathway will provide an obvious connection to Red River College’s Notre Dame Campus, we feel it makes sense to include improvements to the existing Alexander-Pacific-Elgin Neighbourhood Greenway in the Keewatin Street Pathway – Burrows to Gallagher Ave W Functional Design Study, currently scheduled for 2019.

We ask that all candidates in Point Douglas and Old Kildonan commit to the inclusion of  construction of the Gallagher-Dee-Pacific-Oddy Neighbourhood Greenway in plans for the road renewal project on Keewatin Street between Selkirk Avenue and Logan Avenue scheduled for 2021.

Keewatin Street Crossing

Crossing of Keewatin Street along the Alexander-Pacific-Elgin Neighbourhood Greenway is currently aided by a pedestrian corridor, but unfortunately development of the greenway back in 2009.2010 did not include a way for someone on a bike to activate that pedestrian corridor (you have to get up onto the Notre Dame sidewalk to reach the crosswalk – which is offset by a fair bit on the east side of Keewatin Street- and activate the signal). This intersection crossing could be vastly improved through the installation of cyclist activated push buttons on Elgin Ave for activation of the pedestrian corridor and signage requiring northbound drivers on Keewatin Street to stop prior to Elgin Ave. when the pedestrian corridor is activated.

We are asking candidates in Point Douglas, St. James, and Daniel McIntyre to commit to including improvements to the Elgin AVe/Keewatin Street crossing in the Keewatin Street Pathway – Burrows to Gallagher Ave W Functional Design Study and any subsequent construction projects.

Plan & Construct the Gallagher-Dee-Pacific-Oddy Neighbourhood Greenway

Completion of the Keewatin Street Pathway through the Keewatin Street Underpass to Gallagher Ave W. will remove a major barrier for people wishing to bike to the Notre Dame Campus from the city’s northwest. The planned Gallagher-Dee-Pacific-Oddy Neighbourhood Greenway will act as the obvious connection between the two, but it’s planning and development is not currently included in the city’s Pedestrian and Cycling Program plans.

We are asking all candidates in Point Douglas and Old Kildonan to commit to the planning of the Gallagher-Dee-Pacific-Oddy Neighbourhood Greenway in the Keewatin Street Pathway – Burrows to Gallagher Ave W Functional Design Study, currently scheduled for 2019. We would also ask that candidates commit to including construction of the Gallagher-Dee-Pacific-Oddy Neighbourhood Greenway in plans for the road renewal project on Keewatin Street between Selkirk Avenue and Logan Avenue scheduled for 2021.

Improve Connections into RRC from the Sherwin Rd Pathway

The Sherwin Road Pathway makes use of a Pedestrian Corridor to facilitate crossings at Notre Dame Avenue, but the Pedestrian Corridor is located across the street from the pathway, which is on the west side of Sherwin Rd). Shared use pathways on Notre Dame provide a connection from Sherwin Rd to Dalton Crescent, but the connection is one way, and as it necessitates a crossing of Sherwin Rd. to cross Notre Dame Avenue, its a bit awkward.

We are asking candidates to commit to a long term plan to provide connections from Sherwin Rd to:

  • Lismore Ave and the Alexander-Pacific-Elgin Neighbourhood Greenway
  • Bannister Rd
  • King Edward Street at Logan Avenue as a connection to the King Edward Street Pathway.

Planning for Future Connections to the King Edward Underpass & Bikeway

The bicycle network laid out in the 2015 Pedestrian and Cycling Strategies shows a local bikeway along King Edward Street beginning at Manitoba Ave. and running north to Jefferson Ave where it would connect to pathways planned along Jefferson and the planned extension of the Chief Peguis Trail. While the planned bike network does not include a connection through the King Edward Street Underpass, given that Keewatin Street and its pathway are 800m east of King Edward St, it seems obvious that this connection will eventually be needed. The 800m gap between King Edward and Keewatin Streets exceeds the maximum recommended distance between cycling facilities outside of the downtown (see page 135 of the Pedestrian and Cycling Strategies), so an extension of the King Edward Street Pathway south through the King Edward Street Underpass fits in with the strategies key directions 1B.i, 1B.vi, and 1B.xi of the Pedestrian and Cycling Strategies.

Extending the King Edward St Pathway south to Alexander would provide direct access between:

  • Jefferson, Chief Peguis, and Sherwin Rd Pathways
  • Red River College Notre Dame Campus
  • Edon Ross Pool
  • Brooklands School
  • Woodsworth Park
  • Tyndall Park Community Centre
  • Tyndall Park Community School
  • Brooklands, Tyndall Park, Garden Grove, Meadows West, Inkster Gardens, Waterford Green, Castlebury Meadows Neighbourhoods

Interim steps would be to:

  1. Formally adopt an extension of the King Edward Street Pathway south from Manitoba Avenue to Alexander Avenue in the city’s planned Bicycle Network.
  2. Formally adopt an extension of the King Edward Street Pathway west to the Keewatin Street Pathway through Woodsworth Park and Park lane in the city’s planned Bicycle Network.

Summary of Requested Candidate Commitments

  1. Include Planning for the Alexander-Pacific-Elgin and Gallagher-Dee-Pacific-Oddy Neighbourhood Greenways in the 2019 Keewatin Street Pathway – Burrows to Gallagher Ave W Functional Design Study.
  2. Commit to including improvements to the Elgin AVe/Keewatin Street crossing in the Keewatin Street Pathway – Burrows to Gallagher Ave W Functional Design Study and any subsequent construction projects.
  3. Commit to a long term plan to provide connections from Sherwin Rd to:
    • Lismore Ave and the Alexander-Pacific-Elgin Neighbourhood Greenway
    • Bannister Rd
    • King Edward Street at Logan Avenue as a connection to the King Edward Street Pathway.
  4. Formally adopt an extension of the King Edward Street Pathway south from Manitoba Avenue to Alexander Avenue in the city’s planned Bicycle Network.
  5. Formally adopt an extension of the King Edward Street Pathway west to the Keewatin Street Pathway through Woodsworth Park and Park lane in the city’s planned Bicycle Network.

More Information