Tag Archives

Home   Posts tagged "Bicycle Infrastructure"

Chevrier Buffered Bike Lanes

In 2018, buffered bike lanes will be built on Chevrier Boulevard from Waverley Street to Pembina Highway. This will also include construction of a multi-use path on the east side of Waverley Street from Chevrier Boulevard to McGillivray Boulevard. The Chevrier Walk Bike Project will connect residents and businesses to the future Southwest Transitway Chevrier station and pathway. The western extent of the cycling

Read More »


Adjustable Bike Lane Curb Survey

The City is exploring the feasibility of adjustable bike lane curbs. Winnipeg is running a nine-month trial of adjustable bike lane curbs on existing bike lanes. The trial will include testing installation methods, monitoring maintenance including snow clearing and spring clean-up, and comfort level of users. These adjustable bike lane curbs will allow the City to install protected bike lanes, while still being able

Read More »


Bannantyne & McDermot bike lanes

  McDermot Avenue and Bannatyne Avenue provide important east-west connections between Waterfront Drive and Sherbrook Street. This project will improve the existing painted bike lanes to protected lanes so that that they are comfortable for people of all ages and abilities. Construction is expected to being in early summer of one-way protected bike lanes on both McDermot Avenue and Bannatyne Avenue between Waterfront Drive

Read More »


Fermor Bridge Project Includes Walking and Cycling Infrastructure

The pedestrian and cycling improvements that will be built as part of this project include: A north – south pedestrian & cycling underpass crossing of Fermor Avenue in line with Des Meurons Street to the north; Extension and widening of the existing private pedestrian and cycling pathway between Appleton Estates and the Seine River to connect the underpass crossing to Niakwa Road; Direct connections

Read More »


Construction of Garry Street Bike Lane in 2018

Construction of a new, two-way protected bike lane along Garry Street with connections to the Exchange District on Notre Dame Avenue, Princess Street, and Arthur Street is underway and is expected to be complete in 2019. When complete, the new protected bike lane will provide a safe link from the Assiniboine Avenue cycle track to the Exchange District. The two-way bike lane will be physically separated

Read More »


Winnipeg Bike Count 2016

Bike Winnipeg’s bike counts from 2007 to 2016 indicate that: On a typical weekday in mid to late spring, an estimated 6,000 cyclists commuted in and out of the downtown area of Winnipeg, and throughout the entire city about 12,600 cyclists commuted on a given day. The total number of individual commuter cyclists in the city would be higher, given that not every cyclist commutes

Read More »


BW calls for Health Assessment of all Government Expenditures

BW has recommended to the Government review of the Health Care System that all departments be required to produce health impact assessments for future policies and programs. The government must invest in programs and infrastructure that nudge Manitobans toward healthy outcomes, and refrain from investing in those which do the opposite. In particular, the Government should review the health impact of investments in transportation

Read More »


Priorities for Cycling Infrastructure

Bike Winnipeg sent a letter to Mayor and Council this week recommending priorities for cycling infrastructure in the upcoming budget: Based on our experience riding on Winnipeg streets, and talking to many of the people who ride with us, we believe that the City will get the best return on investment by concentrating initial cycling infrastructure investments in: Creating a network of high-quality protected

Read More »


Councilor Browaty opposes key AT Through Pass

Cyclists who live in Councillor Browaty’s riding should call him to set him straight about the need for a safe way to get across the North Perimeter. During the last election, the NDP promised to build a safe AT crossing of the North Perimeter between Henderson and Highway 59. We were consulted on the design on of this crossing, and agreed that the proposed plan made

Read More »